With the direction of the land drilling market gearing more toward longer, deeper wells, rig’s mud systems have to keep up with the demands. Striker is no different, offering multiple solutions to keep your rig up to the market requirements. Here is shown a full mud system solution that includes the addition of a third mud pump, upgrading from 5000 psi to 7500 psi, increasing the size of the suction charge lines to the mud pumps, and optimizing the suction and discharge piping.